After the heavy rains at the end of November, a roofing contractor determined that the Studio and Maxie Hall, the Bigs building, needed to be re-roofed and that Annie Hall required patching.
Welcome to the Fayette Street Academy website. The pictures sprinkled through the site auto-rotate through a set of over one hundred images taken around the school during the past few years.